A polished floor handed over at the end of a project is exposed to every trade that follows: plaster, paint, MEP, glazing, joinery and the cleaning crew. Most damage on a new polished floor happens after the polish, and it is the contractor who pays for it.
| Layer | Product | Protects against | Watch out |
|---|---|---|---|
| Release film | Polyethylene sheet | Paint, plaster, water | Traps moisture if left long |
| Absorbent | Heavy paper or felt | Spills, foot traffic grit | Needs replacing when wet |
| Hard board | Fibre or OSB board | Point loads, ladders, trolleys | Tape only, never nails |
| Edge ramp | Rubber ramp | Trolley wheels at doorways | Keep it clean underneath |
Dragging a scaffold, dropping a tool, welding sparks, solvent spills and adhesive residue are not normal wear, and most warranties exclude them. Photograph the protection at handover of each zone and record the condition at removal. If a trade damages the floor, the cost is theirs, and the photographic record is what makes that a simple conversation instead of a claim.
Price protection as a line item. It costs a fraction of a re-polish, and on a visible floor it is the cheapest insurance in the project.