Average response time: under 24 hours

A typical polished concrete floor takes 3-7 days for 1000 square metres with a two-person crew and one planetary grinder. Grinding alone is 30-50 square metres per hour on the coarse grits, slowing to 20-30 on the fine resin steps.
For machine-matched tooling, browse our 3'' Metal Bond Diamond Grinding Disc with 4 Segments range.A>Only for small areas or a light re-polish of an existing floor, not a full grind on rough concrete.
A>Adding a second grinder roughly halves grinding time but not edge work or curing waits.
A>Yes - plan for a few hours to overnight after densifying.
Looking for the right tool? Check our 3'' Metal Bond Diamond Grinding Disc with 10 Segments. Looking for the right tool? Check our 3'' Metal Bond Diamond Grinding Disc with 5 Segments.Estimate from square metres per hour, add buffer for condition and edges, and schedule curing waits. A realistic timeline keeps the crew calm and the client informed.
Written and reviewed by JOY TECH - an SGS & BV audited, CE/RoHS certified diamond tools manufacturer founded in 2004, exporting to 50+ countries.
Our factory and quality management system are audited by SGS and Bureau Veritas. Products meet CE/RoHS requirements and every piece is 100% inspected before packing.